Raw Water Intertie (CCWD/EBMUD)
CLIENT:  Contra Costa Water District (925.688.8000)

Location:
Brentwood, CA
Contract #:
104063
Start Date:
July 2006
Completion Date:
June 2007
Total Contract Amount:
$2,017,246

The work consisted of the construction of buried piping, connections to existing large diameter piping, 60" ball valves, flow meters, electrical and instrumentation equipment, at-grade, below-grade and above-grade concrete structures, metalwork, site grading and paving and fencing. The project is located in Brentwood, CA.